Legislation Details

File #: 24-574    Version: 1
Type: Consent Calendar Items Status: Agenda Ready
In control: City Council
On agenda: 6/12/2024 Final action:
Title: Adoption of Plans and Specifications and Authorization to Solicit Construction Bids for Magnolia Street from Edinger Avenue to Heil Avenue - Project Plan No.: P-2566. Federal Project No. CRAL-5338(054).
Attachments: 1. Attachment 1 - Project Location Map, 2. Attachment 2 - Magnolia-Edinger to Heil

Westminster City Council

 

SUBJECT

 

Title

Adoption of Plans and Specifications and Authorization to Solicit Construction Bids for Magnolia Street from Edinger Avenue to Heil Avenue - Project Plan No.: P-2566.  Federal Project No. CRAL-5338(054).

End

publichearing

End

 

From:                                          Jake Ngo, Public Works Director/City Engineer

Requested by:                     Administration

Prepared by:                     Theresa Tran, Senior Engineer

____________________________________________________________

 

RECOMMENDED ACTION

 

Recommendation

A.                     Approve the plans and specifications for Magnolia Street from Edinger Avenue to Heil Avenue - Project Plan No.: P-2566 and Federal Project No. CRAL-5338(054), and authorize the Public Works Director/City Engineer to approve minor modifications to the plans and specifications to accommodate requested revisions from public safety and utility agencies; and

 

B.                     Authorize the Public Works Department to advertise and solicit construction bids for said project.

 

end

BACKGROUND

 

The subject project, which was approved by the Mayor and the City Council as a Capital Improvement Project for Fiscal Year 22/23, will rehabilitate Magnolia Street from Edinger Avenue to Heil Avenue.  The City of Fountain Valley will also participate in this project to improve their pavement portion, less than 20%, on Magnolia Street.  The City of Fountain Valley will pay its fair share, in the amount of $258,802 including the 10% contingency, to the City of Westminster after the completion of the project construction. The Mayor and City Council approved the agreement with the City of Fountain Valley on March 22, 2023 and the Master Agreement with the California Department of Transportation (Caltrans) for receiving the state funding on May 22, 2024.

 

The work will consist of:

 

•                     Construction of concrete curb, gutter, sidewalk, spandrel, cross gutter, driveway approaches, and wheelchair ramps with detectable warning surface (truncated dome);

•                     Removal and replacement of deteriorated pavement areas;

•                     Cold planning existing pavement & crack filling entire street width;

•                     Placing asphalt rubberized hot mix (ARHM) surface course;

•                     Adjusting storm drain manholes, sewer manholes, and water/hydrant valve covers to finished grade;

•                     Installing traffic signal loops, traffic control, striping, and pavement markings;

•                     Replacing faded signs and refreshing all curb markings within the project limits.

 

Per Westminster Municipal Code 3.44.120, the City Council shall adopt plans and specifications for all public projects requiring the formal bid procedure, pursuant to Public Contract Code Section 22039.

 

City staff has completed the plans and specifications, and the Public Works Director/City Engineer has approved the plans and specifications for the bidding. The engineer’s estimate for this project is estimated at the amount of $ 1,354,704 including the 10% contingency.

 

Advertising for competitive bidding and the bidding process will be done in accordance with the Public Contract Act and Uniform Cost Account Act. In accordance with the Procurement Policy, staff will return to the Mayor and City Council to recommend award of the contract.

 

The bid opening is planned for July 24, 2024, with the anticipated award date of August 14, 2024.  Construction will subsequently commence in September 2024, with the projected completion date of December 2024.

 

FISCAL IMPACT

 

Funding for this project is allocated in the following existing CIP accounts:

 

1.                     Account No. 20002 - 002300 “Magnolia Street - City Limits to Edinger”

2.                     Account No. 55037 - 372300 “Magnolia Street - City Limits to Edinger (PMRF)” - Master Agreement with Caltrans

3.                     Account No. 55037 - 372301 “Magnolia Street - City Limits to Edinger (I-405)”

 

LEGAL REVIEW

 

The City Attorney’s Office has reviewed as to form.

 

CONCLUSION

 

The proposed project will improve the pavement and concrete work along Magnolia Street from Edinger Avenue to Heil Avenue.  The project location map is also shown on the project’s plans.

 

ATTACHMENTS

 

1.                     Project Map

2.                     Reduced size Project plans (Full size plans and specifications are not attached to this report but are available to review at City Hall).

 

REVIEWED BY

 

Erin Backs, Finance Director

Christian Bettenhausen, City Attorney

Christine Cordon, City Manager