Title: Award of Contract for the Roof Replacement Project at the City Hall Building - Plan No. P-2678.
Attachments: 1. Attachment 1 - Bid Summary, 2. Attachment 2 - Agreement, 3. Attachment 3 - Contractor's Proposal, 4. Attachment 4 - Preconstruction Photos

Westminster City Council

 

SUBJECT

 

Title

Award of Contract for the Roof Replacement Project at the City Hall Building - Plan No. P-2678.

End

 

From:                                          Jake Ngo, Public Works Director

Requested by:                     Administration

Prepared by:                     Tuan Pham, Maintenance and Utilities Manager

____________________________________________________________

 

RECOMMENDED ACTION

 

Recommendation

A.                     Approve the award of contract to the lowest and responsible bidder, Rainy Day Roofing, Inc., in the amount of $594,000, and reject all other bids;

 

B.                     Authorize a 10% contingency for potential change orders in the amount of $59,400; and

 

C.                     Authorize the City Manager to execute the contract on behalf of the City, in a form approved by the City Attorney.

 

end

BACKGROUND

 

On March 11, 2021, President Joe Biden signed the American Rescue Plan Act of 2021 (ARPA) into law to address the economic and health impacts due to the COVID-19 pandemic. As a result, the City of Westminster received an allocation of $23.7 million.

 

A portion of this allocation was budgeted to fund the “Clean and Safe Environment Improvements for City Facilities.” This includes the HVAC and roof replacement at City-owned buildings within the Civic Center. 

 

The project was originally advertised in October 2024, with bids opened on November 25, 2024. Two bids were received and both bids substantially exceeded the engineer’s estimate. As a result, the Mayor and City Council rejected both bids on December 9, 2024.

To reduce costs through value engineering, the Mayor and City Council approved a contract amendment with David Pickard Architects on June 11, 2025. The redesign divided the work into two separate projects - HVAC Replacement and Roof Replacement - to allow contractors to bid more competitively on each specialized trade.

On March 25, 2026, the City Council awarded the HVAC Replacement Project for the City Hall building.  The project is currently under construction.

The Public Works Department publicly advertised the Roof Replacement Project at the City Hall building and received three sealed bids. The bid opening occurred on April 30, 2026, at 10 a.m. The following bids were received:

 

Ranking

Bidder

Base Bid Amount

1

Rainy Day Roofing, Inc.

$594,000

2

 Letner Roofing Company

$1,105,870

3

 Best Contracting Services, Inc.

$1,151,695

Scope of Work

The project generally consists of:

                     Removal and proper disposal of the existing gravel-surfaced roofing membrane, aging pipe supports, deteriorated parapet walls, and energy-inefficient skylights; and

                     Installation of a new WeatherWeld roofing system, including a cool roof reflective coating, shingle-clad parapet walls, and Dura-Blok pipe supports. The new roofing system carries a 40-year warranty.

Staff performed a thorough review of the submitted bid, including checking all references, which yielded positive results. Rainy Day Roofing, Inc. has also been previously vetted and approved by WeatherWeld as an authorized installer.

Construction is scheduled to begin in September 2026, with substantial completion anticipated in November 2026.

FISCAL IMPACT

 

Funding for the contract with Rainy Day Roofing, Inc., including the 10% contingency, in the total amount of $653,400 is available in the following ARPA-funded Account No. 21500-212309 “Clean and Safe Environment Improvements for City Facilities.”

 

LEGAL REVIEW

 

The City Attorney’s Office has reviewed as to form.

 

CONCLUSION

 

Awarding the contract to Rainy Day Roofing, Inc., the lowest and responsible bidder, for the Roof Replacement Project, will provide a cleaner and healthier environment for the public and staff in the City Hall building.

 

 ATTACHMENTS

 

1.                     Bid Summary

2.                     Agreement

3.                     Contractor’s Proposal

4.                     Preconstruction Photos

 